90-day accreditation planner

A spreadsheet for practices preparing for a RACGP 5th edition accreditation visit, so the whole 90 days sits in one place.

The first page of the 90-day accreditation planner template
The first page of the template, as you'll download it. Click the picture to see it full size.

What's inside

  • Run-sheet: your key dates, then each week's tasks with an owner, due date and status.
  • Gap Analysis: work through each criterion and mark it green (we meet it), amber (evidence is thin) or red (we don't meet it, or aren't sure).
  • Evidence checklist: confirm each piece of evidence is ready before the visit.
  • Weekly Stand-up Log: a log of your weekly check-in meetings.

Who fills it in, and when

The practice manager usually keeps it, with a named owner for each task and each gap. Start it the week your visit date is confirmed, about 12 weeks out, and update the status at each weekly 30-minute check-in. The Weekly Stand-up Log has a row for each of the 12 weeks. Bring in a senior GP or clinical governance lead for the clinical criteria.

How to use it

  1. Fill in your visit date and start date on the Run-sheet tab.
  2. Work through the Gap Analysis tab and mark each criterion.
  3. Update the status each week, and tick off the evidence before the visit.

90-day accreditation planner

Excel · 52 KB · free

Which RACGP Standards it helps with

The Gap Analysis tab works through every 5th edition criterion, so the planner does not support one criterion more than another. Beside each criterion it shows where it sits in the 6th edition, taken from the RACGP's mapping between the editions.

An example

Example row on the Run-sheet tab (made-up details): Wk 7, Deep work, Confirm allergy status recorded for every active patient. Owner: Dr Anna Lee. Due: 14 March. Status: In progress. Notes: report run, 42 records still to fix.

Common mistakes to avoid

  • Rating a criterion Green without the evidence to hand, when Green means you meet it and have the evidence.
  • Leaving a gap with nobody's name beside it, when the run-sheet asks for a named owner and a due date for each one.
  • Leaving quality improvement to the end: if it is thin by Week 3, the planner says to start a genuine 4-week improvement cycle straight away.

Goes well with

It goes with our guide Getting ready for a practice accreditation visit: a 90-day plan.